Over the years we have successfully completed projects and services for a number of clients in various industries.

“BUHASA plant shutdown has been completed on 12th April 2016 without HSE incident and in line with the planned start-up. This represents a significant milestone for the Buhasa TARCO control system replacement project. The successful start-up at Buhasa site is appreciated and we would like to ask that you pass on GASCO’s appreciation to all the members of E&I Emirates workforce and their subcontractors who have helped in this achievement. We are looking forward to your team to continue in a similar manner until the conclusion of the project.”

Mahmoud El Waslry

Project Manager

“E&I Emirates proved having quality and experienced workers who carried out the work to the quality and time required by TECHNIP / SHELL Standards. E&I QC/QA system is effectively established in place.
E&I is recommended as a qualified electrical and instrumentation contractor.”

Giancarlo Cartieri

Senior Project Manager

previous arrow
next arrow
Slider

Awards & Certifications

Supply of electrical cables

ADCO

CPECC

Demolition and electrical installation work

ADCO

ADCO

Various civil, electrical & automation supplies and works related to control room relocation

ADNOC DISTRIBUTION

ADNOC DISTRIBUTION

Electrical works – Upgrade of MCC Panel Incoomer Column

ADNOC DISTRIBUTION

ADNOC DISTRIBUTION

EPC for complete revamp and upgrade of control system and instrumentation in 3 compressors & one dryer in Habshan – 0

GASCO

GASCO

Installation of Electrical, Instrumentation, Subcontractor Cathodic Protection and Telecommunication Works

AL HOSN GAS

PUNJLLOYD

Material supply and installation of PQA in SS Sweihan (TRANSCO)

TRANSCO

iTM

Various electrical & automation supplies and works related to control room relocation

ADNOC DISTRIBUTION

ADNOC DISTRIBUTION

Installation Works for wireless EPM instruments

ADNOC DISTRIBUTION

ADNOC DISTRIBUTION

LP COMPRESSORS COINTROL SYSTEM UPGRADE IN ZADCO CSP Site installation works & Supplies Associated with control system upgrade.

ZADCO

SIEMENS UAE

MOSAICS PROJECT – PHASE II C EPC Sub Contract Extension – Additional 6 well heads installation

ZADCO

HONEYWELL ME

TURN-KEY IMPLEMENTATION OF HAZOP STUDY Manpower supply ( Technicians + supervisors)

TAKREER

GULF COAST EL CO.

SW& HW FOR ESTABLISHING MASTER STATION TO COLLECT POWER QUALITY INFORMATION FROM REMOTE SITES Installation works & Commissioning support at SS Sweihan

TRANSCO

Itm

PN 4000 MAJOR RETROFIT PROJECT Switchgear retrofit

ZADCO

DRESSER RAND

PN 4000 MAJOR RETROFIT PROJECT HV cable replacement, Manpower supply

ZADCO

DRESSER RAND

DATA CENTRE FOR MOI SSD data centre

MOI

ALTRON

WIRELESS VIBRATION SYSTEM Installation works and Commissioning support

TAKREER

EMERSON PM

Extension to RS VIEW station to admin bldg. in Al Ain

DDP AL AIN

ADNOC DISTRIB.

Reprogramming of relocated Hypoclorite Plant

AMPC

AL MIRFA POWER COMPANY

Technical Fat support ( man power supply )

BOROUGE 3

HONEYWELL

Technical Fat support ( man power supply )

TAKREER

YOKOGAWA

Supply of lightning poles for ENLOC Fujeirah Distribution and Trading Terminal Project

ENOC

ENOC

Logic Manager Upgrade Project in PE1 Plant

BOROUGE

BOROUGE

Modification work in lightning DB in MOT Fujairah

IPIC

CPECC

Installation of ON-LINE Oxygen Analyser – ASAB 0, ASAB-2, & LGS

GASCO ASAB

GASCO

Upgrading of 7 deluge water s[pray system from Manual to Automatic Fire Detection & Activation

GASCO RUWAIS

GASCO

Ex Enclosure + lightning poles

IPIC

CPECC

Provision of Relocation of Draft Pressure Control 11PIC2X16 on five Furnaces

BOROUGE

BOROUGE

Additional lightning poles, DBs and JBs

IPIC

CPECC

Feeder motor relay installation

GASCO HABSHAN

SCHNEIDER

Bulk Instrumentation Supply

PUNJ LLOYD

Frourine Complex Project

Lightning DBs & JBS modification in all sites

IPIC

CPECC

Upgrade of Bently Nevada MMS 3300 System Habshan 0& 1 – Phase 2&3 (EPC contract)

GASCO HABSHAN

GASCO

Technical support for FAT

SAMSUNG/TAKREER

YOKOGAWA

12c101 LP gas compressor Siemens PLC System replacement & upgrade of field instrumentation (EPC Contract)

GASCO

GASCO HASBAN

Upgrade of Bently Nevada MMS 3300

GASCO

GASCO HABSHAN

Upgrade of Habshan-1 boiler’s obsolete Local controls (EPC contract)

GASCO HABSHAN

GASCO

Installation of Gas Monitor and Electrical Sockets n ASAB Laboratory

GASCO ASAB

GASCO

Replacing in-situ type oxygen analyser With extractive type (supply & installation)

BOROUGE RUWEIS

BOROUGE

MOSAICS Project – Phase II C – Installation works ( EPC Contract)

HONEYWELL ME

ZADCO

Supply of demo panel to EPM showroom

EPM

EMERSON PM

Supply on insulation testers

AMPC

AL MIRFA POWER CO.

Supply of electrical actuators

ESNAAD

ESNAAD

Supply , Installation & Commissioning of CCTV system admin building

AMPC

AL MIRFA POWER CO.

Supply of patch panel cabinet, switch & Router Cabinets

HONEYWELL ME

BOROUGE

Supply of LV DBs for MPS/IPS Stations

CHINA PETROLEUM ENG & CONTR. O.

ADCOP PROJECT (IPIC)

Installation & Commissioning of 20 m lightning poles (81 pcs)

ADCOP PROJECT (IPIC)

CHINA PETROLEUM ENG & CONTR. Co.

Manpower supply ( Instr. Technicians)

FERTIL

FERTIL

New Condensate Line – Detail Engineering

GASCO

ISCO

F&G Project Tatweer – Cabinets (14) for Rockwell Automation

TATWEER Bahrain

HGS

Replacement of Boilers Controls in IES 9 – Feed Study

GASCO HABSHAN

GASCO

Installation of ESD System

ADNOC DISTRIBUTION

EMERSON PM

<

>