Turbine revamp Dresser Rand/ADNOC Offshore

LOCATION: Zakum platforms

PROJECT VALUE: AED15m

2013-2017: Dresser Rand awarded E&I Emirates the EPC contract for the electrical and instrumentation works of the PN4000 ZADCO Major Retrofit Project in Upper Zakum.

PROJECT SCOPE:

  • Electrical, instrumentation installation
  • LV Switchgear revamp
  • HV cable installation (11KV – 22KV)
  • Supply of bulk materials and cables